Flat and commercial renovation in Bağcılar. Zone-by-zone planning so you can stay at home, plumbing priority, workshop-warehouse work; free survey.

Renovation Services in Bağcılar

The building stock of Bağcılar consists mainly of apartments built between 1990 and 2005. These flats are solid, but the time for renewing the kitchen, bathroom and plumbing has arrived. Added to this is the district's dense stock of workshops, shops and warehouses. Erdağ Yapı Dekorasyon delivers turnkey flat and commercial renovation throughout Bağcılar.

Our Bağcılar Renovation Services

  • Complete flat renovation and interior renewal
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Replacement of old water and electrical installations
  • Layout changes and drywall partitions
  • Laminate parquet, ceramic and floor coverings
  • Workshop, shop, office and warehouse renovation

Planning Renovation for a Large Household

Flats in Bağcılar are often home to large families, and moving out is not easy. In that case we plan the renovation zone by zone: one bathroom is completed and brought back into use before moving to the next, and while the kitchen is renewed we set up a temporary preparation area. This approach lengthens the job a little but makes it possible for the family to stay at home — and saves the cost of a hotel. We plan it together at the survey.

Plumbing Comes First

Plumbing over 20 years old will force newly laid tiling to come up at the first leak; at the survey we assess its age and, if needed, recommend replacing it before any painting.

Request a free survey for your Bağcılar renovation project.

Frequently Asked Questions

How long does renovation take in Bağcılar?

Repainting and re-flooring takes 3-5 days, while a full renovation including kitchen and bathroom takes 3-5 weeks. Zone-by-zone planning while you stay at home can lengthen this slightly.

Can renovation be done without moving out?

Yes, by planning zone by zone. One bathroom is completed and brought back into use before moving to the next; while the kitchen is renewed we set up a temporary preparation area. It lengthens the job but lets the family stay at home.

Do you renovate workshops and warehouses?

Yes. We can plan phased and out-of-hours work so production is not disrupted.

Can I stay in the flat during the work?

For partial work, yes. We give advance notice of days when water or power must go off. For a full renovation, living in is hard — dust and noise run all day.

Plasterboard or block partitions?

For partitions, plasterboard is faster, lighter and takes services inside it. Where sound insulation matters, double boarding with mineral wool gets close to a block wall. If heavy units are going up, we add noggings behind the board.

Do the pipes have to be replaced?

If the building is over 25 years old and has galvanised pipe, we recommend it. A leak appearing under new tiling means opening the whole job up again.

Can the price change later?

The quotation is itemised, with material brands and quantities written in. Changes come only from your request or from a surprise in the building, and both need written approval.

How is payment structured?

The payment schedule is written into the contract, usually in three parts: start, completion of first fix, and handover. We accept cash, transfer and card.

What stages does a renovation follow?

Strip-out, services, wet-area waterproofing, screed, first-fix surfaces, finishes and fit-out. We inspect together at the end of each stage, and that stage is then paid.