Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06

Bayrampaşa Renovation Services

Professional service in and around Bayrampaşa, Istanbul

Flat and commercial renovation in Bayrampaşa. Phased budgeting, plumbing priority, fast planning for shop and warehouse work; free survey, one-year guarantee.

Renovation Services in Bayrampaşa

The building stock of Bayrampaşa consists mainly of apartments built between 1980 and 2000. These flats are solid, but the time for renewing the kitchen, bathroom and plumbing has arrived. Added to this is the dense commercial building stock around the Coach Terminal and the Wholesale Market. Erdağ Yapı Dekorasyon delivers turnkey flat and commercial renovation throughout Bayrampaşa.

Our Bayrampaşa Renovation Services

  • Complete flat renovation and interior renewal
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Replacement of old water and electrical installations
  • Layout changes and drywall partitions
  • Laminate parquet, ceramic and floor coverings
  • Shop, office, warehouse and wholesale premises renovation

Dividing the Budget into Phases

A full renovation does not suit every budget. The approach we often apply in Bayrampaşa is to divide the work into phases by priority: the most urgent kitchen or bathroom first, then the living room and bedrooms a few months later. We prepare a separate written quote for each phase so you can spread the spending over time. If the plumbing is over 20 years old we recommend putting it in the first phase — left until later, newly laid tiling has to be torn out.

Speed in Commercial Spaces

For shops and warehouses around the Coach Terminal and Wholesale Market, every closed day is lost income; we give an exact number of days at the survey and build the plan around the shortest closure.

Request a free survey for your Bayrampaşa renovation project.

Frequently Asked Questions

Can I have the renovation done in phases?

Yes. We can plan the most urgent kitchen or bathroom first, then the living room and bedrooms a few months later; a separate written quote is prepared for each phase.

Which work should I do first?

If the plumbing is over 20 years old we recommend that first. Left until later, newly laid tiling and paint have to be torn out at the first leak.

Do you renovate shops and warehouses?

Yes. For shops, offices and warehouses around the Coach Terminal and Wholesale Market we plan to minimise the closure and give an exact number of days at the survey.

Can I stay in the flat during the work?

For paint, flooring and wall work most families stay put; we work room by room and screen off the dust. If a kitchen or bathroom is being fully renewed, that room is out of use for 1-2 weeks.

Plasterboard or block partitions?

For partitions, plasterboard is faster, lighter and takes services inside it. Where sound insulation matters, double boarding with mineral wool gets close to a block wall. If heavy units are going up, we add noggings behind the board.

How long does a bathroom refit take?

Ten working days on average, longer if your chosen items are out of stock. That's why we ask you to finalise sanitaryware and taps before we start.

Can a kitchen be renovated without replacing the units?

Yes. If the carcasses are sound, changing just the doors and worktop renews most kitchens at well below the cost of a full replacement.

Plasterboard or block walls?

Plasterboard adds no load to the structure, so we prefer it on upper floors and in older buildings. If heavy units are going up, we plan noggings behind the board from the start.

What stages does a renovation follow?

Strip-out, services, wet-area waterproofing, screed, first-fix surfaces, finishes and fit-out. We inspect together at the end of each stage, and that stage is then paid.

Değerlendirmeler

Henüz değerlendirme yapılmamış. İlk siz değerlendirin!

Değerlendirme Yapın