Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06

Beyoğlu Renovation Services

Professional service in and around Beyoğlu, Istanbul

Flat, hotel and commercial renovation in Beyoğlu. Renovation with restoration in historic apartments, transparent logistics cost, original detail preservation; free survey.

Renovation Services in Beyoğlu

Renovation in Beyoğlu demands patience as much as technical knowledge. The nineteenth-century apartments of Galata and Cihangir, the transforming commercial buildings of Karaköy, and the hotels and businesses around İstiklal all come with old building stock, registration status and narrow-street logistics. Erdağ Yapı Dekorasyon delivers turnkey flat, hotel and commercial renovation throughout Beyoğlu.

Our Beyoğlu Renovation Services

  • Renovation with restoration in historic apartment flats
  • Boutique hotel, café, bar and restaurant renovation
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Plumbing and electrical replacement in century-old buildings
  • Timber, tile, natural stone and ceramic flooring
  • Restoration of original detail (cornices, joinery, brickwork)

Logistics Is Part of the Budget

In Beyoğlu, moving materials is a cost item that does not exist in other districts. Streets vehicles cannot enter, five-storey buildings without lifts, steep and narrow staircases — these tie debris removal and material delivery to carrying by hand. Rather than hide this in the quote we show it as a separate item, because it is a real cost of the job and should be known from the start. We always assess access to the building at the survey.

One Point of Contact, a Written Quote

All items are managed under a single contract, with a one-year workmanship guarantee.

Request a free survey for your Beyoğlu renovation project.

Frequently Asked Questions

How long does renovation take in Beyoğlu?

Repainting and re-flooring takes 3-5 days, a full renovation including kitchen and bathroom 4-6 weeks, and a project involving historic restoration 8-16 weeks. Logistical conditions affect the timing.

Do narrow streets and no lift raise the cost?

Yes. Streets vehicles cannot enter, buildings without lifts and narrow staircases tie debris removal and material delivery to carrying by hand. We show this as a separate item in the quote rather than hiding it.

Are original details preserved?

Yes. Cornices, timber joinery, brick walls and period tiles are preserved and restored wherever possible; once these details are gone they do not come back.

Do you renovate cafés and restaurants?

Yes. We plan to minimise the closure and give an exact number of days at the survey.

Can I stay in the flat during the work?

For partial work, yes. We give advance notice of days when water or power must go off. For a full renovation, living in is hard — dust and noise run all day.

Who removes the rubble?

Rubble removal is in the price with no later extras. We sweep the communal areas every evening — most neighbour complaints start there.

Can the price change later?

Not unless the scope in the contract changes. If something unexpected appears when a wall is opened — rotten pipework, damp — we show you and take approval before doing anything.

How long does a bathroom refit take?

We plan for two weeks: 1-2 days strip-out, 2 days services, 2-3 days for tanking and screed to cure, 3-4 days tiling, 2 days fit-out. If materials arrive on time the schedule holds.

Wood flooring or tiles?

Wood-look warms a living room; tiles wear better in hallways and entrances. Transitions need planning from the start or the threshold strip becomes a problem later.

Değerlendirmeler

Henüz değerlendirme yapılmamış. İlk siz değerlendirin!

Değerlendirme Yapın