Çatalca Renovation Services

Professional service in and around Çatalca, Istanbul

Detached home, cottage and commercial renovation in Çatalca. Floor and flue planning around the heating system, insulation coordination; free survey.

Renovation Services in Çatalca

Renovating a house in Çatalca brings up something that never arises in the city centre: heating. Parts of the villages and rural settlements have no natural gas infrastructure, and that directly changes the scope of a renovation. Erdağ Yapı Dekorasyon delivers turnkey detached home, cottage and commercial renovation throughout Çatalca.

Decide the Heating System Early

Heating is the item that must be decided at the very start of a renovation, because the chosen system determines the wall, floor and flue work. If a solid-fuel system is to be used, the flue condition and space for fuel storage matter. If underfloor heating is being considered, the floor level and insulation layer must be planned accordingly — that decision cannot be reversed once the floor is laid. If a heat pump or air-conditioning system is chosen, the capacity of the electrical panel must be checked. Leaving this to the end means tearing out completed work. It is the first subject we raise at the survey.

Our Çatalca Renovation Services

  • Detached home, cottage and village house renovation
  • Floor and flue planning around the heating system
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Water and electrical installation renewal
  • Coordination of thermal insulation and joinery renewal
  • Ceramic, LVT, laminate and natural stone flooring

One Point of Contact, a Written Quote

All items are managed under a single contract with photo progress updates, and a one-year workmanship guarantee.

Request a free survey for your Çatalca renovation project.

Frequently Asked Questions

How long does renovation take in Çatalca?

Repainting and re-flooring takes 3-5 days, a full renovation including kitchen and bathroom 3-6 weeks, and a detached house 6-12 weeks depending on scope.

When should I decide on heating?

At the very start. The chosen system determines wall, floor and flue work; underfloor heating affects floor level, solid fuel the flue, a heat pump the electrical panel capacity. Leaving it to the end means tearing out completed work.

What do you suggest where there is no natural gas?

At the survey we assess the existing infrastructure and how you use the house, then decide together between solid fuel, a heat pump or air-conditioning systems.

Is insulation essential in a village house?

If it will be lived in year-round, yes. In an uninsulated house the interior decoration is damaged within a couple of winters and heating costs stay high.

Can I stay in the flat during the work?

For paint, flooring and wall work most families stay put; we work room by room and screen off the dust. If a kitchen or bathroom is being fully renewed, that room is out of use for 1-2 weeks.

Who removes the rubble?

Haulage and disposal are ours. We use bulk bags or a skip depending on the building's rules, and we protect the lift if it's being used.

How long does a bathroom refit take?

Ten working days on average, longer if your chosen items are out of stock. That's why we ask you to finalise sanitaryware and taps before we start.

Plasterboard or block walls?

For partitions, plasterboard is faster, lighter and takes services inside it. Where sound insulation matters, double boarding with mineral wool gets close to a block wall.

Wood flooring or tiles?

Tiles in wet rooms and kitchens, wood in living spaces. Laminate is cheap and fast but does not get on with water; LVT can go into wet areas and is quieter. If there is underfloor heating, the product must be rated for it.