Çekmeköy Renovation Services

Professional service in and around Çekmeköy, Istanbul

Villa and flat renovation in Çekmeköy. Planning around estate management procedures, protection of communal areas; free survey and guarantee.

Renovation Services in Çekmeköy

Renovation in Çekmeköy raises an issue that most districts do not: estate management rules. On gated estates and villa settlements, renovation is not only a matter between you and your contractor; the management plan and the order of neighbourly life are part of the process too. Erdağ Yapı Dekorasyon delivers turnkey villa, flat and commercial renovation throughout Çekmeköy.

Settling the Estate Procedure Up Front

Most gated estates require an application to management before renovation, compliance with working hours and a specific method for removing debris. Learning these later stops the work and pushes the schedule back. At the survey stage we find out the working hours, lift rules and debris removal procedure from the estate management and build the programme around them. Team details and vehicle plates are notified in advance; protection is laid in communal areas and cleaning is done at the end of every day. Finishing on time without trouble with the neighbours runs through this preparation.

Our Çekmeköy Renovation Services

  • A work programme planned around estate procedures
  • Complete villa, duplex and flat renovation
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Water and electrical installation renewal
  • Drywall partitions, suspended ceilings and lighting
  • Parquet, ceramic, LVT and natural stone flooring

One Point of Contact, a Written Quote

All items are managed under a single contract, with a one-year workmanship guarantee.

Request a free survey for your Çekmeköy renovation project.

Frequently Asked Questions

What stages does a renovation follow?

Strip-out, services, wet-area waterproofing, screed, first-fix surfaces, finishes and fit-out. We inspect together at the end of each stage, and that stage is then paid.

Do restricted hours make the work longer?

Limited hours can affect the schedule, which is why we give a realistic duration from the start. Rules discovered later stop the work and upset the programme.

Are communal areas protected?

Yes. Team and vehicle details are notified in advance, protection is laid in lifts and corridors, and cleaning is done at the end of every day.

Can I stay in the flat during the work?

For partial work, yes. We give advance notice of days when water or power must go off. For a full renovation, living in is hard — dust and noise run all day.

Do the pipes have to be replaced?

We look at the condition. Copper or PPRC with no sign of leaks, we leave alone. Galvanised pipe narrows with rust, so we advise replacement.

Can the price change later?

Not unless the scope in the contract changes. If something unexpected appears when a wall is opened — rotten pipework, damp — we show you and take approval before doing anything.

How long does a bathroom refit take?

We plan for two weeks: 1-2 days strip-out, 2 days services, 2-3 days for tanking and screed to cure, 3-4 days tiling, 2 days fit-out. If materials arrive on time the schedule holds.

Can a kitchen be renovated without replacing the units?

It's possible. We check the carcasses and hinges first. Where the carcass is sound, door replacement is both quicker and far less messy.

Plasterboard or block walls?

For partitions, plasterboard is faster, lighter and takes services inside it. Where sound insulation matters, double boarding with mineral wool gets close to a block wall.