Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06

Esenler Renovation Services

Professional service in and around Esenler, Istanbul

Flat and commercial renovation in Esenler. Kitchen-bathroom renewal, replacement of old installations, flooring and painting; free survey, phased planning and a one-year workmanship guarantee.

Renovation Services in Esenler

Esenler is one of Istanbul's densely built residential districts. Apartment buildings of 20 to 30 years old in the Menderes, Oruçreis and Havaalanı neighbourhoods sit alongside blocks renewed through urban regeneration. In the older flats, ageing plumbing, worn flooring and kitchen-bathroom layouts that no longer meet everyday needs are the most common reasons people call us. Erdağ Yapı Dekorasyon delivers turnkey flat and commercial renovation throughout Esenler.

Our Esenler Renovation Services

  • Complete flat renovation and interior renewal
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Replacement of old electrical and plumbing installations
  • Laminate parquet, ceramic and floor coverings
  • Drywall, suspended ceilings and cornices
  • Painting and wallpaper application

In Older Buildings, Plumbing Comes First

Here is what we see often in the older apartments of Esenler: a flat is refreshed cosmetically, then a few months later a galvanised pipe starts leaking and the newly laid tiling has to come up. That is why we always assess the age of the installation during the survey and, where needed, recommend replacing it before any painting. The right sequence saves money in the long run.

Planning That Fits Your Budget

You do not have to do everything at once. We can agree the priority items together and set up a phased plan. A free survey, an itemised written quote and a one-year workmanship guarantee are our standard.

Request a free survey for your Esenler renovation project.

Frequently Asked Questions

How long does flat renovation take in Esenler?

Repainting and re-flooring takes 3-5 days, while a full renovation including kitchen and bathroom takes 3-5 weeks. After the survey we give you a day-by-day schedule.

Should I replace the plumbing in an older flat?

For galvanised installations over 20 years old we recommend replacement. Otherwise newly laid tiling and paintwork have to be torn out at the first leak. We assess the condition of the installation together during the survey.

Can I have the renovation done in phases?

Yes. Depending on your budget we can plan the kitchen and bathroom first, then the living room and bedrooms in a later phase. A separate written quote is prepared for each phase.

Is debris and waste removal included?

Yes, debris removal after strip-out and post-construction rough cleaning at the end of the job are included in our quote.

Can I stay in the flat during the work?

The scope decides. A single-room refit is fine to stay through. If screed is being poured or services opened up, we suggest staying elsewhere for a few days.

Do the pipes have to be replaced?

If the building is over 25 years old and has galvanised pipe, we recommend it. A leak appearing under new tiling means opening the whole job up again.

How is payment structured?

We work on a stage-payment basis tied to the programme. We inspect each stage together, then that stage is paid.

How long does a bathroom refit take?

Ten working days on average, longer if your chosen items are out of stock. That's why we ask you to finalise sanitaryware and taps before we start.

Can a kitchen be renovated without replacing the units?

Yes. If the carcasses are sound, changing just the doors and worktop renews most kitchens at well below the cost of a full replacement.

Değerlendirmeler

Henüz değerlendirme yapılmamış. İlk siz değerlendirin!

Değerlendirme Yapın