Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06

Güngören Renovation Services

Professional service in and around Güngören, Istanbul

Flat and commercial renovation in Güngören. Season-calendar planning for showroom renewal, plumbing priority, warehouse-office work; free survey.

Renovation Services in Güngören

Demand for renovation in Güngören comes along two lines: renewing the 20-to-30-year-old flats of its dense residential fabric, and the regular refresh needs of showrooms, offices and warehouses at the centre of the textile trade. Erdağ Yapı Dekorasyon delivers turnkey flat and commercial renovation throughout Güngören.

Our Güngören Renovation Services

  • Complete flat renovation and interior renewal
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Replacement of old water and electrical installations
  • Showroom, office, warehouse and wholesale premises renovation
  • Laminate parquet, ceramic, LVT and epoxy flooring
  • Professional lighting infrastructure installation

Season Matters in Showroom Renewal

In the textile sector certain periods of the year are critical for sales; closing a showroom at the start of a season is direct lost income. For commercial projects in Güngören we recommend setting the schedule around the sector's season calendar: the renewal is done between seasons and handed over ready for the season opening. This planning does not change the cost of the same work but noticeably reduces the business's loss. At the survey we ask about your season calendar.

The Right Sequence in Homes

Plumbing over 20 years old will force newly laid tiling to come up at the first leak; at the survey we assess its age and, if needed, recommend doing that first.

Request a free survey for your Güngören renovation project.

Frequently Asked Questions

How long does renovation take in Güngören?

Repainting and re-flooring takes 3-5 days, while a full renovation including kitchen and bathroom takes 3-5 weeks. Showroom renewal varies with scope; we give an exact number of days at the survey.

When should I renew my showroom?

Between seasons. In textiles, closing a showroom at the start of a season is direct lost income; we set the schedule around the sector calendar and hand over ready for the season opening.

Do you renovate warehouses and offices?

Yes. We can plan phased and out-of-hours work so operations are not disrupted.

Wood flooring or tiles?

Tiles in wet rooms and kitchens, wood in living spaces. Laminate is cheap and fast but doesn't get on with water; LVT can go into wet areas and is quieter underfoot.

Who removes the rubble?

Rubble removal is in the price with no later extras. We sweep the communal areas every evening — most neighbour complaints start there.

Do the pipes have to be replaced?

If the building is over 25 years old and has galvanised pipe, we recommend it. A leak appearing under new tiling means opening the whole job up again.

How is payment structured?

We work on a stage-payment basis tied to the programme. We inspect each stage together, then that stage is paid.

How long does a bathroom refit take?

Ten working days on average, longer if your chosen items are out of stock. That's why we ask you to finalise sanitaryware and taps before we start.

When can the room be used after painting?

The same day with water-based products. The surface dries in hours and reaches full hardness within about seven days; just keep heavy furniture off the wall in the first week.

Değerlendirmeler

Henüz değerlendirme yapılmamış. İlk siz değerlendirin!

Değerlendirme Yapın