Şile Renovation Services

Professional service in and around Şile, Istanbul

Summer house, detached home and guest house renovation in Şile. Water pressure and infrastructure solutions, out-of-season planning; free survey.

Renovation Services in Şile

The questions that need answering before starting a renovation in Şile differ from those in the city centre. In rural and coastal settlements the infrastructure is not the same on every plot, and that directly shapes the scope of a project. Erdağ Yapı Dekorasyon delivers turnkey summer house, detached home and hospitality renovation throughout Şile.

Settle the Infrastructure First

The first things we ask at the survey are these: is there mains water or is a well and tank in use, is the water pressure adequate, is waste water connected to the sewer or to a septic tank, are power cuts frequent. These answers change the kitchen and bathroom design directly. In a low-pressure system, for example, a rain shower will not work without a booster pump; in a house on a septic tank, renewing a wet area means revisiting the pipe falls and the connection. If these are not resolved up front, a newly built bathroom disappoints on first use.

Our Şile Renovation Services

  • Complete summer house and detached home renovation
  • Water pressure, tank and booster pump solutions
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Water and electrical installation renewal
  • Out-of-season renovation for guest houses and boutique hotels
  • Ceramic, LVT, laminate and natural stone flooring

One Point of Contact, a Written Quote

All items are managed under a single contract with photo progress updates, and a one-year workmanship guarantee.

Request a free survey for your Şile renovation project.

Frequently Asked Questions

How long does renovation take in Şile?

Repainting and re-flooring takes 3-5 days, a full renovation including kitchen and bathroom 3-6 weeks, and guest house work varies with the number of rooms.

What should be checked before renovation?

The infrastructure. Whether water is mains or from a well, whether pressure is adequate, whether waste water goes to the sewer or a septic tank, and how frequent power cuts are all change the design directly.

What is done if water pressure is low?

We plan a tank and booster pump; otherwise fittings such as rain showers do not perform as expected and the new bathroom disappoints.

When should a guest house be renovated?

Out of season. With room-by-room phasing we can also progress without closing the business entirely.

When can the room be used after painting?

The same day with water-based products. The surface dries in hours and reaches full hardness within about seven days; just keep heavy furniture off the wall in the first week.

How is payment structured?

In stages. A materials advance at the start, interim payments as work packages complete, and the balance on handover. We don't ask for payment upfront.

Can a kitchen be renovated without replacing the units?

Yes — it's a solution we use often. New worktop, doors and splashback make a kitchen look rebuilt. We only replace carcasses where there is swelling or rot.

Wood flooring or tiles?

Wood-look warms a living room; tiles wear better in hallways and entrances. Transitions need planning from the start or the threshold strip becomes a problem later.

Plasterboard or block walls?

For partitions, plasterboard is faster, lighter and takes services inside it. Where sound insulation matters, double boarding with mineral wool gets close to a block wall.