Flat and commercial renovation in Sultangazi. Gaining rooms with drywall partitions, light and ventilation planning, balcony enclosure; free survey.

Renovation Services in Sultangazi

Because larger households are common in Sultangazi, the renovation request we receive most often is about gaining a room: dividing a large living room, splitting a wide bedroom in two, bringing a balcony inside. Erdağ Yapı Dekorasyon delivers turnkey flat and commercial renovation throughout Sultangazi.

When Dividing a Room, Do Not Lose Light and Ventilation

Dividing a room in two with drywall is technically easy; the real question is whether both halves remain liveable afterwards. If the half away from the window gets no daylight or air, the room you gained soon becomes unusable, and the risk of damp and mould rises in winter. So on partition projects we set the dividing line according to the window position and, where needed, plan a glazed upper section or a transom opening. Electrics and lighting are also designed separately for each half.

Our Sultangazi Renovation Services

  • Gaining rooms with drywall partitions
  • Enclosing balconies and bringing them inside
  • Complete flat renovation
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Water and electrical installation renewal
  • Workshop, shop and commercial renovation

One Point of Contact, a Written Quote

All items are managed under a single contract, with a one-year workmanship guarantee.

Request a free survey for your Sultangazi renovation project.

Frequently Asked Questions

How long does renovation take in Sultangazi?

A drywall partition takes 2-4 days, repainting and re-flooring 3-5 days, and a full renovation including kitchen and bathroom 3-5 weeks.

Does dividing a room in two make sense?

It is technically easy, but if the half away from the window gets no light or air it soon becomes unusable and damp risk rises. We set the dividing line by the window position and plan a glazed section where needed.

What stages does a renovation follow?

Strip-out, services, wet-area waterproofing, screed, first-fix surfaces, finishes and fit-out. We inspect together at the end of each stage, and that stage is then paid.

Who removes the rubble?

We do, and it is included in the quote. Rubble isn't left in the flat overnight; on larger jobs we take it to a licensed tipping site.

Can the price change later?

The quotation is itemised, with material brands and quantities written in. Changes come only from your request or from a surprise in the building, and both need written approval.

How is payment structured?

The payment schedule is written into the contract, usually in three parts: start, completion of first fix, and handover. We accept cash, transfer and card.

How long does a bathroom refit take?

An average bathroom takes 10-14 working days. What sets the pace isn't the tiling but the curing of screed and tanking; trying to rush those causes problems later.

Plasterboard or block walls?

Plasterboard adds no load to the structure, so we prefer it on upper floors and in older buildings. If heavy units are going up, we plan noggings behind the board from the start.

Do you clean up when the work is finished?

Yes — communal areas each evening and a tidy-up at the end of each day are standard. At handover the construction dust is gone and floors and surfaces are wiped.