Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06

Arnavutköy Renovation Services

Professional service in and around Arnavutköy, Istanbul

Flat, duplex, villa and commercial renovation in Arnavutköy. Kitchen-bathroom renewal, flooring, painting and plumbing; free survey, written quote and a one-year workmanship guarantee.

Renovation Services in Arnavutköy

Arnavutköy is one of the Istanbul districts whose building stock has changed fastest over the past decade. The new gated communities around Hadımköy and Bolluca, the mass-housing blocks in Taşoluk and the detached homes in the town centre all create very different renovation needs. With more than 20 years of field experience, Erdağ Yapı Dekorasyon delivers turnkey renovation for flats, duplexes, villas and commercial units across Arnavutköy.

Our Arnavutköy Renovation Services

  • Complete flat, duplex and villa renovation
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Drywall partitions, suspended ceilings and cornices
  • Laminate parquet, ceramic and floor coverings
  • Painting, wallpaper and decorative coatings
  • Electrical and plumbing renewal

How the Process Works

We begin with a free on-site survey, measuring the space and checking the existing plumbing and flooring. We then provide an itemised written quote, so no surprise costs appear during the work. Once approved, the schedule is fixed and the entire project is run by one team with a single point of contact.

Why Erdağ Yapı Dekorasyon?

We have worked in both the new builds and the older buildings of Arnavutköy; we know which walls are load-bearing and which installations genuinely need replacing. We provide a one-year workmanship guarantee and transfer the manufacturer's warranty on materials to you. Post-construction rough cleaning is included.

Request a free survey for your Arnavutköy renovation project and we will get back to you the same day.

Frequently Asked Questions

How long does renovation take in Arnavutköy?

It depends on the scope. Repainting and re-flooring a flat takes 3-5 days, while a full renovation including kitchen and bathroom takes 3-5 weeks. We give an exact schedule after the survey.

How do you determine the renovation price?

By square metre, the materials chosen and the work items involved. During the free survey we take measurements and prepare an itemised written quote; nothing you have not approved appears on the invoice.

Can I stay at home during the renovation?

For single-item jobs such as painting or flooring, usually yes. For a full renovation including kitchen and bathroom we recommend moving out temporarily, because water and electricity will be cut off at times.

Do you offer a workmanship guarantee?

Yes, we provide a one-year guarantee on all our workmanship. The manufacturer's warranty on the materials used is also transferred to you.

Wood flooring or tiles?

Wood-look warms a living room; tiles wear better in hallways and entrances. Transitions need planning from the start or the threshold strip becomes a problem later.

Who removes the rubble?

We do, and it is included in the quote. Rubble isn't left in the flat overnight; on larger jobs we take it to a licensed tipping site.

Do the pipes have to be replaced?

Not obligatory, but the timing matters. While the walls are already open, replacing services is cheap; doing the same work two years later means breaking tiles.

Plasterboard or block walls?

For partitions, plasterboard is faster, lighter and takes services inside it. Where sound insulation matters, double boarding with mineral wool gets close to a block wall.

When can the room be used after painting?

The same day with water-based products. The surface dries in hours and reaches full hardness within about seven days; just keep heavy furniture off the wall in the first week.

Değerlendirmeler

Henüz değerlendirme yapılmamış. İlk siz değerlendirin!

Değerlendirme Yapın