Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06

Bakırköy Renovation Services

Professional service in and around Bakırköy, Istanbul

Flat, villa and commercial renovation in Bakırköy. Kitchen-bathroom renewal, plumbing, damp repair, flooring and painting; Ataköy-Yeşilköy projects, free survey, one-year guarantee.

Renovation and Refurbishment in Bakırköy

Bakırköy's building stock is well built but mature in character. The Ataköy estates, the established apartments of central Bakırköy and the Yeşilköy villas are solid buildings whose kitchens, bathrooms and services have reached the time for renewal. Erdağ Yapı Dekorasyon delivers turnkey flat, villa and commercial renovation throughout Bakırköy.

What Sets Renovation Costs in Bakırköy

Scope sets the figure in renovation; the largest items are the kitchen, the wet areas and the flooring. Two factors push costs up in Bakırköy: the 20-to-30-year age of the stock means services come up in almost every project, and damp repair in seafront flats forms an extra item. Against that, flats here are generally large, so the unit cost works out more efficiently than in smaller properties.

Services and Damp in Mature Buildings

In the quality 20-to-30-year-old apartments of Bakırköy, the most common need is renewing the wet areas. Tiling laid without renewing the old plumbing has to be torn out at the first leak, so we assess the age of the installation at the survey. In flats in Ataköy and along the shore we also check for facade-borne damp and do not begin cosmetic work until the source is removed. Both sound like cost-adding measures, but the opposite is true: work done without fixing the source gets done a second time within two years.

Work We Have Completed in Bakırköy

In this area we have completed projects in the meeting room and WCs of the Lazerline Clinic, at DTM and at Wolki Cafe in Aqua Florya. In commercial spaces the programme is critical, so we compress the schedule to minimise closed days and work nights where needed.

From Contract to Handover

  • Complete renovation of flats, villas and residences
  • Kitchen and bathroom renewal, wet-area waterproofing
  • Damp and moisture repair in seafront flats
  • Parquet, natural stone, ceramic and floor coverings
  • Drywall partitions, suspended ceilings and cornices
  • Painting, wall coverings and decorative finishes

Who Is Responsible for What

Every item — services, flooring, painting and decoration — is managed under a single contract, with a one-year workmanship guarantee.

Let us assess the age of the services on site so there are no surprises. The survey is free.

Frequently Asked Questions

What sets the cost of a bathroom refit in Bakırköy?

In Bakırköy's 20-to-30-year-old apartments, replacing the services comes up in almost every project, so the budget has to allow for it. The two items that decide the total are the class of sanitaryware and tiling, and whether the services are replaced.

What makes a full flat renovation budget vary?

Scope, not floor area, decides: are the services being replaced, is the wet-area tanking being opened, are the windows being renewed. Bakırköy's large flats make the unit cost efficient, but the age of the stock brings the services item up in almost every project.

Are new services essential in a 20-to-30-year-old flat?

If there is galvanised pipe, we recommend it. While the walls are open, replacement is cheap; two years later the same work means breaking new tiling. Copper or PPRC with no sign of leaks we leave alone.

How is damp handled in seafront flats?

We find the source first: a facade joint, condensation, or a leak from next door. We do not start cosmetic work until it is closed. Reversing that order means having the work done twice within two years.

How long does a bathroom take?

An average of 10-14 working days. The pace is set by the curing of screed and tanking, not the tiling. We ask you to finalise sanitaryware and taps before we start.

Can I stay in the flat during the work?

For partial work, yes. Bakırköy's large flats make it easy to work room by room. If a kitchen or bathroom is being fully renewed, that room is out of use for 1-2 weeks.

When can the room be used after painting?

The same day with water-based products. The surface dries in hours and reaches full hardness within about seven days; just keep heavy furniture off the wall in the first week.

Who removes the rubble?

We do, and it is included. Rubble is not left in the flat overnight; we take it to a licensed tipping site. We sweep the communal areas every evening.

Do you take on clinic and shop refits?

We do. In Bakırköy we have worked in commercial spaces such as the Lazerline Clinic and Wolki Cafe in Aqua Florya. Commercially every closed day is lost revenue, so we compress the programme and work nights where needed.

Can the price change later?

Not unless the scope in the contract changes. If something unexpected appears when a wall is opened, we show you and take written approval before proceeding.

How is payment structured?

In stages: a materials advance at the start, interim payments as items complete, the balance on handover. We do not ask for payment upfront.

Değerlendirmeler

Henüz değerlendirme yapılmamış. İlk siz değerlendirin!

Değerlendirme Yapın