Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06
Interior Wall Partitioning and Design with Drywall

Interior Wall Partitioning and Design with Drywall

3.529 views

Design with Drywall Systems

Drywall systems find widespread use in modern renovation projects thanks to their speed, flexibility and cost advantages.

Space Division

A drywall partition is ideal for dividing an open-plan area in two or creating a work corner. It is completed much faster than a conventional brick wall and creates less load.

Decorative Niches

Niches carved into a wall are valuable areas both for storage and aesthetics. Niches created with drywall become a striking design element when highlighted with backlighting.

Fitted Bookcases and Cabinets

Fitted bookcase and cabinet systems created with a drywall frame offer a more organic look, integrated with the space, than ready-made furniture.

Sound Insulation

Partition walls built with double-layer drywall and mineral wool infill offer sound-insulation performance close to a single-course brick wall.

Frequently Asked Questions

How many days does a home renovation take?

It depends on the scope. In our apartment renovations a cosmetic refresh such as painting and wallpapering takes a few days, and a full renovation including services, bathroom and kitchen can take 3 to 6 weeks. The main things that lengthen it are the drying times of screed, plaster and paint, made-to-order items such as kitchen units, and the building's permitted working hours. We give the exact schedule in writing after the survey.

How much does a home renovation cost?

The total is decided not by the size of the home but by the scope of the work: whether the services are renewed, the bathroom and kitchen, flooring, plasterboard, paint and the materials chosen. That is why two homes of the same size can cost very different amounts. A figure given without seeing the home is a guess. In a free survey we take measurements, give a quote listing every item of work and keep within the agreed budget.

In what order is a home renovation done?

From rough to fine: strip-out and demolition, plumbing and wiring, plaster and plasterboard, waterproofing and tiling in wet rooms, windows and door frames, filler and first coat of paint, kitchen and bathroom units, flooring, and last of all the final coat of paint and the wallpaper. The rule is simple: work that makes dust and uses water comes first, surfaces that scratch come later. If the order is broken, finished work has to be done again.

All frequently asked questions →

Reviews

No reviews yet. Be the first to leave one!

Leave a Review