Renovation Company in Istanbul

Professional service in and around İstanbul, Istanbul

Turnkey flat, office and commercial renovation across Istanbul. Invisible work first: services and waterproofing. Itemised written quote, one-year workmanship guarantee.

Turnkey Renovation

What usually inflates a renovation is the unexpected items: the old pipework revealed when tiling comes off, damp behind an opened wall, a consumer unit that will not carry the new load. We discuss these at the survey and write them into the quote. Not springing surprise items on you matters more to us than making the job look cheap.

The Invisible Work Comes First

In a flat over twenty years old, the most expensive mistake is laying new tiling over old pipework. At the first leak the new work has to come out. So we order the job like this: water and electrical services and wet-area waterproofing first, then joinery and thermal insulation, and finally the kitchen, bathroom and finishes. On top floors, marks on the ceiling are usually a problem of insulation rather than paint, so there we check the roof first.

In Buildings Awaiting Regeneration

A question we are often asked: our building will go into urban regeneration within a few years, should we renovate? In that case we do not recommend a comprehensive investment. Paint, flooring and, if needed, bathroom repair raise comfort and pay back in the short term; kitchen cabinetry or a full wet-area renewal is better left until afterwards. At the survey we listen to your building's situation and give a plain recommendation — even when it means no work for us.

Beyond Homes

We also renovate office floors, clinics, stores and canteens. The notary facade in Üsküdar and the entrance areas of the TOKİ Ayazma residences in İkitelli are among the projects we completed on that side.

For an itemised written quote call +90 212 672 43 06. Workmanship is guaranteed for one year.

Frequently Asked Questions

How long does renovation take?

Repainting and re-flooring takes 3-5 days, and a full flat renovation including kitchen and bathroom 3-5 weeks. We share a day-by-day schedule after the survey.

Will there be surprise costs?

To avoid them we inspect pipework, damp and the consumer unit at the survey and write the risks into the quote. If something unexpected appears, we tell you and get approval first.

My building will be redeveloped — should I still renovate?

We do not recommend a comprehensive investment. Focus on comfort-raising work such as paint, flooring and bathroom repair; leave the kitchen and full wet-area renewal until after the redevelopment.

Is replacing the plumbing essential?

We recommend it for installations over 20 years old. Otherwise newly laid tiling has to be torn out at the first leak.

Do you give a guarantee?

We guarantee workmanship for one year. Material guarantees follow the manufacturer's terms, and we state which product carries what cover in the quote.

What stages does a renovation follow?

Strip-out, services, wet-area waterproofing, screed, first-fix surfaces, finishes and fit-out. We inspect together at the end of each stage, and that stage is then paid.

Who removes the rubble?

We do, and it is included in the quote. Rubble isn't left in the flat overnight; on larger jobs we take it to a licensed tipping site.

Do the pipes have to be replaced?

Not obligatory, but the timing matters. While the walls are already open, replacing services is cheap; doing the same work two years later means breaking tiles.

How long does a bathroom refit take?

Ten working days on average, longer if your chosen items are out of stock. That's why we ask you to finalise sanitaryware and taps before we start.