Erdağ Construction & Decoration ve Duvar Kağıdı Mağazası | İstanbul 0212 672 43 06
In an Old Home, Is Wallpaper or Paint the Better Choice?

In an Old Home, Is Wallpaper or Paint the Better Choice?

86 views

In an old home the condition of the wall decides. On walls with hairline cracks and unevenness, non-woven wallpaper or glass textile makes more sense because it covers the flaws. On walls with sound, even plaster, paint is enough and more economical.

Choosing by the condition of the wall

  • Hairline cracks: non-woven wallpaper, or glass textile that is painted over.
  • Uneven, patched plaster: a thick, textured paper; glossy paint shows every ripple.
  • Even, sound plaster: paint; changing the colour later is easy.
  • Damp wall: neither; the source of the damp is dealt with first.

The weak point of paint in an old home

Paint is a thin film; as the plaster underneath moves, the crack comes back. A new coat over many layers of old paint can also blister in time.

The weak point of wallpaper in an old home

It needs preparation: the old paper is stripped and the wall is primed. Wallpaper is not hung over crumbling plaster.

For those who want a paint colour and a cure for cracks

Glass textile is glued to the wall and painted in the colour you want; it reinforces the wall and, according to its manufacturer, can be repainted 10 to 15 times.

Can new wallpaper go over the old?

We do not recommend it; the old paper should be stripped. During the survey Erdağ Yapı tests the wall and makes a recommendation; see our wallpaper and glass textile application pages.

Frequently Asked Questions

How many days does a home renovation take?

It depends on the scope. In our apartment renovations a cosmetic refresh such as painting and wallpapering takes a few days, and a full renovation including services, bathroom and kitchen can take 3 to 6 weeks. The main things that lengthen it are the drying times of screed, plaster and paint, made-to-order items such as kitchen units, and the building's permitted working hours. We give the exact schedule in writing after the survey.

How much does a home renovation cost?

The total is decided not by the size of the home but by the scope of the work: whether the services are renewed, the bathroom and kitchen, flooring, plasterboard, paint and the materials chosen. That is why two homes of the same size can cost very different amounts. A figure given without seeing the home is a guess. In a free survey we take measurements, give a quote listing every item of work and keep within the agreed budget.

In what order is a home renovation done?

From rough to fine: strip-out and demolition, plumbing and wiring, plaster and plasterboard, waterproofing and tiling in wet rooms, windows and door frames, filler and first coat of paint, kitchen and bathroom units, flooring, and last of all the final coat of paint and the wallpaper. The rule is simple: work that makes dust and uses water comes first, surfaces that scratch come later. If the order is broken, finished work has to be done again.

All frequently asked questions →

Reviews

No reviews yet. Be the first to leave one!

Leave a Review