Choosing a Renovation Company: What Matters Besides the Quoted Price?
Look at the content of the quote before the price: items of work, materials, time, payment plan, guarantee and completed…
16 items found — 16 articles

Look at the content of the quote before the price: items of work, materials, time, payment plan, guarantee and completed…

A worn wall is renewed in six steps: stripping, scraping, repair, primer, filling and sanding, then paint or wallpaper.…

A renovation is taken over in daylight, room by room, against the items in the quote; defects go on a written list.…

In an old home wiring, plumbing and damp are checked first; then essential work, budget and order are settled. Decoratio…

For a multi-trade renovation one company has the edge: order, schedule and responsibility sit in one place. For a single…

Before moving in, finish the work that makes dust and cuts off the water: services, bathroom and kitchen, flooring and p…

In an old home the condition of the wall decides: non-woven wallpaper or glass textile for cracked, uneven walls, paint …

Wiring and plumbing should be checked before walls are renewed; every channel cut afterwards spoils the paint and wallpa…

Extra cost mostly appears after strip-out: old pipework, poor plaster and screed, damp. The second big cause is decision…

In a survey the home is measured and the walls, floors and services are examined. A price given by phone is a guess; a w…

In an old home the hidden things are checked first: wiring, water pipes, drains, damp, plaster, windows and doors, and f…

A cosmetic refresh takes a few days; a full apartment renovation can take 3 to 6 weeks. Scope, drying times and made-to-…