
Home Renovation: One Company or Separate Tradesmen?
For a multi-trade renovation one company has the edge: order, schedule and responsibility sit in one place. For a single…
11 items found — 11 articles
Our main page on this topic: Apartment Renovation →
The topic “Full Home Renovation” is covered in 11 pages on our site: 11 articles. Below you will find their titles and short summaries; our main page on this topic is “Apartment Renovation”. The pages come from our services, products, area pages and guides; the site survey and written quote are free across Istanbul.

For a multi-trade renovation one company has the edge: order, schedule and responsibility sit in one place. For a single…

Before moving in, finish the work that makes dust and cuts off the water: services, bathroom and kitchen, flooring and p…

In an old home the condition of the wall decides: non-woven wallpaper or glass textile for cracked, uneven walls, paint …

Wiring and plumbing should be checked before walls are renewed; every channel cut afterwards spoils the paint and wallpa…

In a survey the home is measured and the walls, floors and services are examined. A price given by phone is a guess; a w…

In an old home the hidden things are checked first: wiring, water pipes, drains, damp, plaster, windows and doors, and f…

A cosmetic refresh takes a few days; a full apartment renovation can take 3 to 6 weeks. Scope, drying times and made-to-…

You can live at home during small jobs; for major renovations with demolition, services and new floors, moving out is ad…

A full renovation moves from rough to fine and from top to bottom: it starts with strip-out and services and ends with f…

First the rough work in kitchen and bathroom, then the first coats of paint, then units and flooring, and the final coat…

A renovation starts with a list of needs: first write what will be done, then settle the budget, survey, priorities and …