How Is Staff Comfort Protected While an Office Is Renovated?

How Is Staff Comfort Protected While an Office Is Renovated?

80 views

Four things spoil staff comfort: dust, noise, smell and uncertainty. All four can be managed by sealing off the working area, moving noisy jobs out of hours, ventilating well and sending a weekly notice.

Four problems, four measures

  • Dust: the working area is closed off from ceiling to floor with sheeting; sanding is done with dust-extraction machines and the area is swept daily.
  • Noise: demolition, drilling and cutting are moved to the evening or the weekend.
  • Smell: water-based paints are used; painting is done on Friday evening and the space is aired over the weekend.
  • Uncertainty: staff are told in advance which section will be closed on which day.

Temporary working arrangements

The team from the section being renewed moves to a meeting room or a spare room, or works from home in rotation. Desks, computers and files are labelled before they are moved, so everyone finds their things in place on return.

Safety

Cables and materials are not left in walkways, wet floors and freshly painted surfaces are marked, and fire exits are kept clear.

How does a renovation improve comfort permanently?

Acoustic ceilings and panels reduce echo and the right lighting reduces eye strain. Making these decisions during the renovation is easier than adding them later. See Erdağ Yapı's acoustic panel and office renovation pages.

Frequently Asked Questions

How much does a home renovation cost?

The total is decided not by the size of the home but by the scope of the work: whether the services are renewed, the bathroom and kitchen, flooring, plasterboard, paint and the materials chosen. That is why two homes of the same size can cost very different amounts. A figure given without seeing the home is a guess. In a free survey we take measurements, give a quote listing every item of work and keep within the agreed budget.

In what order is a home renovation done?

From rough to fine: strip-out and demolition, plumbing and wiring, plaster and plasterboard, waterproofing and tiling in wet rooms, windows and door frames, filler and first coat of paint, kitchen and bathroom units, flooring, and last of all the final coat of paint and the wallpaper. The rule is simple: work that makes dust and uses water comes first, surfaces that scratch come later. If the order is broken, finished work has to be done again.

At what hours can home renovation work be done?

Working hours are set by the rules of the building or estate management and by the municipality's noise regulations, and they vary from building to building. Out of consideration for neighbours we generally work during daytime working hours. Before starting we find out the management's rules and plan noisy jobs such as demolition and drilling for the permitted hours.

All frequently asked questions →

Reviews

No reviews yet. Be the first to leave one!

Leave a Review