
When Should Painting and Decoration Be Done in a Workplace Renovation?
Painting and decoration come after services, suspended ceilings and partitions, and before flooring and furniture.…
12 items found — 12 articles

Painting and decoration come after services, suspended ceilings and partitions, and before flooring and furniture.…

A restaurant wall is soiled daily by vapour, splashes and touch. A washable covering decides both the impression of hygi…

The wall is the backdrop to the product: its colour, texture and lighting affect how the product is perceived and where …

Dust, noise, smell and uncertainty spoil comfort in an office renovation; screening, out-of-hours work, ventilation and …

In a workplace a survey and a design fix the time and budget in advance: dimensions, services, building rules and the pr…

A workplace renovation can be done in the evenings, at night and at weekends, provided the work is split properly and th…

In hotel rooms wallpaper is chosen because it wipes clean, can be repaired strip by strip and gives every room the same …

In an office both are usually combined: paint in work areas, wallpaper in reception and meeting rooms, glass textile in …

Restaurant walls are chosen by zone: atmosphere and washability in the dining room, hygiene in the kitchen, water resist…

In a shop renovation, traffic is protected by splitting the work into sections and moving it to hours when there are no …

Small office refurbishments take a few days and a full floor 2 to 4 weeks; out-of-hours planning shortens the time staff…

Before an office renovation, settle the building rules, the layout, power and data needs, acoustics and the working sche…