Where Should You Start a Home Renovation?

Where Should You Start a Home Renovation?

96 views

A home renovation starts not with looking for tradesmen but with writing down what is to be done. First a list of needs is drawn up, then the budget is set, a survey is carried out and the jobs are put in order of importance. Demolition and painting come after these steps.

The right start in five steps

  1. List of needs: write down what is to be done in each room; separate the essential from the optional.
  2. Budget frame: set the upper limit you can spend and leave a margin for unexpected work.
  3. Survey and written quote: show the home on site and have every item of work written down.
  4. Priorities: hidden work first (plumbing, wiring, waterproofing), visible work afterwards.
  5. Choice of materials: choose made-to-order items such as kitchen units and doors early.

The most common mistake

Starting with paint and flooring and leaving the plumbing and wiring for later. Every channel cut afterwards damages the newly finished wall and floor.

If the budget is tight, what can be postponed?

Decorative work: wallpaper, a feature wall and light fittings can be done later. Plumbing, wiring and waterproofing cannot be postponed.

How to prepare for the first meeting

Have your list ready, the floor plan if you have one, and a few photos of examples you like. Erdağ Yapı carries out the survey free of charge and gives the quote in writing; details are on our apartment renovation page.

Frequently Asked Questions

How much does a home renovation cost?

The total is decided not by the size of the home but by the scope of the work: whether the services are renewed, the bathroom and kitchen, flooring, plasterboard, paint and the materials chosen. That is why two homes of the same size can cost very different amounts. A figure given without seeing the home is a guess. In a free survey we take measurements, give a quote listing every item of work and keep within the agreed budget.

In what order is a home renovation done?

From rough to fine: strip-out and demolition, plumbing and wiring, plaster and plasterboard, waterproofing and tiling in wet rooms, windows and door frames, filler and first coat of paint, kitchen and bathroom units, flooring, and last of all the final coat of paint and the wallpaper. The rule is simple: work that makes dust and uses water comes first, surfaces that scratch come later. If the order is broken, finished work has to be done again.

At what hours can home renovation work be done?

Working hours are set by the rules of the building or estate management and by the municipality's noise regulations, and they vary from building to building. Out of consideration for neighbours we generally work during daytime working hours. Before starting we find out the management's rules and plan noisy jobs such as demolition and drilling for the permitted hours.

All frequently asked questions →

Reviews

No reviews yet. Be the first to leave one!

Leave a Review